Alexandria: Water Main Testing
This is a notification from Virginia American Water. Our contractor, Utilities Unlimited, will test pit an existing water main at 24 East Rosemont Ave (Hooffs Run Park and Greenway). Weather permitting, construction work will occur from October 22 to October 24, between the hours of 8 a.m. and 6 p.m. daily.
It is important to note that our contractor will try to keep one traffic lane open at all times to local traffic as long as it can be done safely. Construction does not impact access to homes and driveways of residents. Please follow traffic control and the “NO PARKING” signage that will be posted by the City of Alexandria. Some construction noise will be unavoidable with this project, but our contractor will work to minimize the disturbance. If you are a landlord and water service is in your name, please inform your tenants so they are aware of this construction.
For more information or to see a map of the affected area please go to www.amwater.com/vaaw/alerts . For more information about this project, please contact Virginia American Water by email at Hao.Chen@amwater.com or call 703-706-3889. Thanks
Show Less